Two new kitchen cabinets for above the sink. Will be stained after the image is complete.
Monday, October 5, 2020
Back of the seat storage
Hera the van has been on several trips over the late summer. Here you can see the storage
I've installed on the back of the seats. Two old jean legs have been made into pockets. Tools
get velcro'd on. This way they are easy to hang back up and remove and re-arrange.
Subscribe to:
Posts (Atom)
Watertank Cover
The new watertank cover is finished and installed. I'm very pleased with it.
-
Two more sets of doors have been made and installed. I haven't stained them yet, as I am out of stain. I wanted to get them installed th...
-
The final left side cabinet in the kitchen. Need to make the next ones that go to the right Under the fridge is the cabinet that holds our g...